Home / Oct 28, 2026 / official post

Press Secretariat: Shared a video in which First Lady Gabriela de Bukele talks about the work behind the production "El mundo mágico de Cri-Cri: Una historia para imaginar juntos"

Secretaría de Prensa de la Presidencia @SecPrensaSV · Oct 27, 2026 · 21:18 (El Salvador time)

Original post (full text, in its original language)

La Primera Dama de la República, Gabriela de Bukele, compartió parte del trabajo desarrollado para la producción de “El mundo mágico de Cri-Cri: Una historia para imaginar juntos”. "Fue todo un reto, pero ver a niños, jóvenes y adultos cantando, sonriendo y disfrutando de una presentación que preparamos con tanto cariño hizo que cada esfuerzo valiera la pena", dijo.— Secretaría de Prensa de la Presidencia (@SecPrensaSV) · Oct 27, 2026 · 21:18 (El Salvador time)

The post includes a video; open it on X to see it.

View original on X ↗

Our summary

The presidential press office shared a video in which First Lady Gabriela de Bukele talks about the work behind the production "El mundo mágico de Cri-Cri: Una historia para imaginar juntos".

Text copied verbatim from X (t.co short links omitted). Open it on X for photos and video. https://x.com/SecPrensaSV/status/2115282076719092076

Related

Assembly of the Pacific Airport terminal structure moves ahead

Construction of the Pacific Airport, in the Conchagua district of La Unión Sur, is moving ahead with the lifting and assembly of the structural pieces that will form the passenger terminal. Cranes and specialized machinery are raising large steel elements that will make up the building's roof. According to La Página, the project, together with Surf City 2, is part of the plans to transform the country's eastern region.

Diario La Página +1 · Oct 28, 2026

Public Works presents its 2027 budget and expects to start the Apopa bypass by December at the latest

Public Works Minister Romeo Rodríguez presented his ministry's proposed 2027 budget to the Legislative Assembly's Finance Committee. According to the minister, construction of the Apopa bypass could begin by December at the latest, but the tender is in the final stage of bid evaluation and World Bank reviews are still pending before it is awarded. The project calls for a new 4.8-kilometer, four-lane road with 12 bridges connecting the Carretera de Oro with the Troncal del Norte without passing through central Apopa. Infobae reports that the ministry's total proposed budget is $1,057 million, which it describes as the largest in its history; the Assembly still has to approve it.

Infobae +1 · Oct 28, 2026

Assembly of the first Mejicanos cable car stations will begin in November

Public Works Minister Romeo Rodríguez announced that assembly of the first stations of the Mejicanos cable car and its electromechanical components will begin between the first and second week of November. Meanwhile, tower installation continues. The project will run about 3.5 kilometers, with four stations, 23 towers and 153 cabins. According to the ministry, the system would start operating in 2027, although there is still no opening date.

Prensa Latina +1 · Oct 28, 2026